1.1 MATERIAL INSPECTION
Third party inspector shall examine the original or authenticated copies of mill certificates of material for compliance with specifications, and where appropriate with drawings. The review includes checks on:
1.2 FABRICATION INSPECTION
The third party inspector checks the following items in the steam turbine fabrication inspection process:
1.3 INSPECTION TESTS
1. Hydrostatic Tests
The Steam Turbine and other pressure containing parts are hydrostatically tested. The main items are:
2. Rotor Balance Test
3. Over Speed Test
4. Clearance Checks
The following areas are examined:
5. Mechanical Running Test
Following items are taken into account for gas turbine mechanical running test:
6. Governor Test
The following characteristics are important:
7. Performance Test
Third party inspector witnesses the gas turbine performance test and following points are taken
in account:
8. Mechanical testing:
9. Fracture and fatigue testing:
1.4 FINAL VISUAL INSPECTION
A visual examination including a partial strip down of the unit is usually required by the specification and is witnessed by third party inspector. The particular areas of interest are:
1.5 PAINTING AND COATING INSPECTION
It is necessary that surface condition is free from pinholes, runs damage and other discontinuity. Surface preparation for painting checked for the following points, according to specification:
First Contact
Scheduling an Interview
Phone/ Qualification Interview
Meeting in Real Life
Application for the Position
![your-application-process[1]](/_next/image?url=https%3A%2F%2Fedge.sitecorecloud.io%2Fbrunelinterddf0-bruneldigit4055-production-3558%2Fmedia%2FBrunel-img%2FChina-website-images%2FHeader-images%2Fyour-application-process.png%3Fmw%3D1080&w=3840&q=75)