Unfortunately, the job listing you are looking for is no longer available.
Project Lead - Steam Turbine
Kuwait, Safat
Unfortunately, the job listing you are looking for is no longer available.
Kuwait, Safat
1.1 MATERIAL INSPECTION
Third party inspector shall examine the original or authenticated copies of mill certificates of material for compliance with specifications, and where appropriate with drawings. The review includes checks on:
1.2 FABRICATION INSPECTION
The third party inspector checks the following items in the steam turbine fabrication inspection process:
1.3 INSPECTION TESTS
1. Hydrostatic Tests
The Steam Turbine and other pressure containing parts are hydrostatically tested. The main items are:
2. Rotor Balance Test
3. Over Speed Test
4. Clearance Checks
The following areas are examined:
5. Mechanical Running Test
Following items are taken into account for gas turbine mechanical running test:
6. Governor Test
The following characteristics are important:
7. Performance Test
Third party inspector witnesses the gas turbine performance test and following points are taken
in account:
8. Mechanical testing:
9. Fracture and fatigue testing:
1.4 FINAL VISUAL INSPECTION
A visual examination including a partial strip down of the unit is usually required by the specification and is witnessed by third party inspector. The particular areas of interest are:
1.5 PAINTING AND COATING INSPECTION
It is necessary that surface condition is free from pinholes, runs damage and other discontinuity. Surface preparation for painting checked for the following points, according to specification:
![your-application-process[1]](/_next/image?url=https%3A%2F%2Fedge.sitecorecloud.io%2Fbrunelinterddf0-bruneldigit4055-production-3558%2Fmedia%2FBrunel-img%2FChina-website-images%2FHeader-images%2Fyour-application-process.png%3Fmw%3D1080&w=3840&q=75)
Application process & contact
Project discussion with our customer
The decision
Introductory conversation with Brunel
Welcome to Brunel