Visual inspection
- Compliance survey to electric Hazards area: As per client rules and IEC or API codes performing compliance survey to rig electrical equipment which has been installed in Hazards Area, verifying that all electrical parts in hazards Area are properly used in the corresponding explosion-proof sections;
- Rig condition mechanical parts visual inspection to compliance with API standards, such as API4F, API 8C, API 7K, API 6A, API, 16C, 16D & STD 53 etc;
- Drops survey to verify is any easy dropped objective on above 1.8 meters as per DROPS.
Rig equipment condition survey
- Perform rig Re-activation inspection in (Cold Stuck or Warm Stuck) in site, monitoring test inspection for single equipment (rotary table, travelling block, TDS, mud tank, pumps, BOP, MCC, diesel engine etc.) and whole drilling rig to verify equipment mechanical, electrical and hydraulic system condition whether to meet the specification. Endurance testing will be included in this section;
- Document survey: review the rig document, like COC, operation manuals, maintenance manuals, etc. to confirm whether documents control meet the requirement of oil field drilling.